A manufacturing facility produces standard and deluxe patio chairs. Each standard chair requires 1.5 hours of assembly and 0.5 hours of finishing, while each deluxe chair requires 2.5 hours of assembly and 1.0 hour of finishing. During a given production run, the plant has exactly 120 labor-hours allocated to assembly and 45 labor-hours allocated to finishing. Write the system of linear equations representing the exact, simultaneous boundary saturation of both labor capacities, and determine whether there exists a non-negative production schedule (s,d) that exhausts both labor pools simultaneously with zero idle time.
A manufacturing facility produces standard and deluxe patio chairs. Each standard chair requires 1.5 hours of assembly and 0.5 hours of finishing, while each deluxe chair requires 2.5 hours of assembly and 1.0 hour of finishing. During a given production run, the plant has exactly 120 labor-hours allocated to assembly and 45 labor-hours allocated to finishing. Write the system of linear equations representing the exact, simultaneous boundary saturation of both labor capacities, and determine whether there exists a non-negative production schedule (s,d) that exhausts both labor pools simultaneously with zero idle time.
Common Mistakes & Teacher Diagnosis
01 The student groups the coefficients by chair type rather than by labor constraint, creating an invalid system that sets chair hours equal to labor hours.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 11
1.5s + 0.5s = 120 ⟹ 2.5d + 1.0d = 45
Correct\lbrace 1.5s + 2.5d = 120, 0.5s + 1.0d = 45
You grouped assembly hours and finishing hours for each chair type into separate equations. However, the totals of 120 hours and 45 hours represent separate resource pools shared by both chairs. The assembly equation must sum all assembly time (1.5s+2.5d=120), and the finishing equation must sum all finishing time (0.5s+1.0d=45).
Made a similar mistake?Check my work on ACEpath → - Step 22
2.0s = 120 ⟹ s = 60 3.5d = 45 ⟹ d = 3.545 = 790
Correct3(0.5s + 1.0d) = 1.5s + 3.0d = 135 ⟹ 0.5d = 15 ⟹ d = 30, s = 30
Your algebraic simplification and division were technically accurate for the equations you wrote, but solving uncoupled one-variable equations followed directly from the incorrect system setup.
- Step 33
Since s = 60 and d = 790 are non-negative, a non-negative schedule exists.
CorrectSince s = 30 ≥ 0 and d = 30 ≥ 0 are non-negative integers, an exact schedule exists at (s, d) = (30, 30).
While your logical check for non-negativity was sound in principle, your conclusion was based on invalid production values resulting from the setup error.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly identified that the variables s and d represent the two chair types.
You carried out your algebraic solving steps and fractions accurately without arithmetic errors.
You remembered to check whether the resulting solution satisfied the non-negativity feasibility condition.
THE ERROR
Where Your ACEpath Teacher Spotted the Mistakenone
WHY IT HAPPENED
ACEpath Teacher's DiagnosisYou clustered the coefficients by product category rather than by shared resource constraint, treating each product as if it had its own separate total pool of hours.
REASONING PATH
Your ACEpath teacher’s suggested approach- Unit and Pool Alignment Check
Each linear constraint equation in a resource-allocation problem must equate total consumption of one specific resource to the total capacity of that same resource.
Label the total on the right side first (e.g., total assembly hours), then ensure every term added on the left side represents hours drawn from that exact same resource pool.
CORRECTED PATH
ACEpath Teacher's DemonstrationSet up the assembly constraint by summing assembly hours from both chair types: 1.5s+2.5d=120.
Set up the finishing constraint by summing finishing hours from both chair types: 0.5s+1.0d=45.
Multiply the finishing equation by 3 to align the s-coefficients: 1.5s+3.0d=135.
Subtract the assembly equation from this result: (1.5s+3.0d)−(1.5s+2.5d)=135−120⟹0.5d=15⟹d=30.
Substitute d=30 into 0.5s+1.0(30)=45⟹0.5s=15⟹s=30.
Verify feasibility: both s=30 and d=30 are non-negative integers.
\lbrace 1.5s + 2.5d = 120, 0.5s + 1.0d = 45; (s, d) = (30, 30)
NEXT STEPS
Final Takeaways from Your TeacherPractice setting up a two-way data table (rows as resources, columns as items) before writing constraint equations.
Verify that every term along the left side of an equation shares the exact same physical measurement unit as the constant on the right side.
02 The student makes an elimination error by failing to multiply all terms in the second equation, concluding that no non-negative schedule exists.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 11
1.5s + 2.5d = 120, 0.5s + 1.0d = 45
- Step 22
Multiply second equation by 3: 1.5s + 3d = 45
Correct3(0.5s + 1.0d) = 3(45) ⟹ 1.5s + 3.0d = 135
When multiplying an equation by a scalar, you must multiply both sides. Multiplying the left side by 3 gave 1.5s+3d, but the right side was left as 45 instead of 3×45=135.
Made a similar mistake?Check my work on ACEpath → - Step 33
(1.5s + 3d) - (1.5s + 2.5d) = 45 - 120 ⟹ 0.5d = -75 ⟹ d = -150
Correct(1.5s + 3.0d) - (1.5s + 2.5d) = 135 - 120 ⟹ 0.5d = 15 ⟹ d = 30
Your subtraction and isolation logic followed correctly from your previous line, but the result was distorted by the unscaled right-hand side.
- Step 44
0.5s + (-150) = 45 ⟹ 0.5s = 195 ⟹ s = 390
Correct0.5s + 1.0(30) = 45 ⟹ 0.5s = 15 ⟹ s = 30
You correctly substituted your calculated value of d back into the original equation, but the propagated error produced s=390 instead of s=30.
- Step 55
Since d = -150 is negative, no non-negative production schedule exists.
CorrectA feasible schedule exists at (s, d) = (30, 30).
Your reasoning that negative chair counts are physically impossible is sound, but because the true solution is (30,30), a valid non-negative production schedule does exist.
WHAT YOU DID WELL
Compliments from Your TeacherYou translated the word problem into two correct linear equations.
You selected a valid elimination strategy by targeting the s variable.
You correctly interpreted that a real-world production schedule requires non-negative quantities.
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou applied the multiplier 3 to the variable terms on the left side of 0.5s+1.0d=45, but omitted multiplying the right-hand constant 45.
WHY IT HAPPENED
ACEpath Teacher's DiagnosisIncomplete application of the multiplication property of equality across parentheses when scaling an entire equation.
REASONING PATH
Your ACEpath teacher’s suggested approach- Use Explicit Parentheses
Multiplying an equation means multiplying both expressions: k⋅(LHS)=k⋅(RHS).
Always write parentheses around both sides before multiplying: 3(0.5s+1.0d)=3(45).
- Reasonableness Check
Real-world manufacturing models with positive resource pools typically produce positive quantities.
If a standard linear production model yields an extreme negative quantity like −150, pause immediately to check for arithmetic or sign slips in elimination.
CORRECTED PATH
ACEpath Teacher's DemonstrationMultiply both sides by 3: 3(0.5s+1.0d)=3(45)⟹1.5s+3.0d=135.
Subtract the first equation: (1.5s+3.0d)−(1.5s+2.5d)=135−120⟹0.5d=15.
Solve for d: d=0.515=30.
Substitute d=30 into 0.5s+1.0(30)=45⟹0.5s=15⟹s=30.
An exact non-negative boundary saturation schedule exists at (s,d)=(30,30).
NEXT STEPS
Final Takeaways from Your TeacherPractice scaling linear equations by explicitly writing parentheses on both sides.
Re-solve the system using substitution to verify that both methods lead to (30,30).
Work through mixed word problems requiring feasibility checks on variable bounds.
03 The student swaps the assembly and finishing labor hour totals, leading to a negative value for the number of deluxe chairs.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 11
1.5s + 2.5d = 45 \ 0.5s + 1.0d = 120
Correct\lbrace 1.5s + 2.5d = 120, 0.5s + 1.0d = 45
You correctly matched the assembly rates (1.5 and 2.5) and finishing rates (0.5 and 1.0), but you swapped their total available hours by setting assembly equal to 45 and finishing equal to 120 instead of 120 and 45.
Made a similar mistake?Check my work on ACEpath → - Step 22
Multiply second equation by 3!: 1.5s + 3.0d = 360 ⟹ Subtract first equation!: 0.5d = 315 ⟹ d = 630
Correct3(0.5s + 1.0d) = 3(45) ⟹ 1.5s + 3.0d = 135 ⟹ (1.5s + 3.0d) - (1.5s + 2.5d) = 135 - 120 ⟹ 0.5d = 15 ⟹ d = 30
Your elimination logic was completely accurate for your written system, but the value of d was affected by the swapped constants from Step 1.
- Step 33
0.5s + 630 = 120 ⟹ 0.5s = -510 ⟹ s = -1020
Correct0.5s + 1.0(30) = 45 ⟹ 0.5s = 15 ⟹ s = 30
You substituted and solved for s correctly based on your previous equations, but the negative value resulted from the initial constant swap.
- Step 44
Since s = -1020 is negative, no non-negative production schedule exists.
CorrectSince s = 30 and d = 30 are non-negative integers, an exact boundary saturation schedule exists at (s, d) = (30, 30).
Your interpretation of non-negativity was logically sound, but because the correct solution is (30,30), a valid non-negative schedule does exist.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly identified the hourly rate coefficients for both standard and deluxe chairs across assembly and finishing.
You carried out the elimination method flawlessly by scaling the second equation by 3 to eliminate s.
You substituted your value of d back into an equation and solved for s with sound algebraic arithmetic.
You correctly evaluated the non-negativity constraint on production variables when interpreting your result.
THE ERROR
Where Your ACEpath Teacher Spotted the Mistakeno
WHY IT HAPPENED
ACEpath Teacher's DiagnosisYou matched the variable coefficients by department correctly, but you paired the total available capacity of assembly with finishing and finishing with assembly.
REASONING PATH
Your ACEpath teacher’s suggested approach- Label Each Equation by Resource
Every equation in a resource-allocation model represents exactly one resource pool: ∑(rate per unit)×(units)=total capacity of that resource.
Write the resource name (e.g., 'Assembly:' and 'Finishing:') before writing down the equation, and immediately place that resource's total on the right-hand side.
CORRECTED PATH
ACEpath Teacher's DemonstrationSet up the system with the correct right-hand resource totals: {1.5s+2.5d=120,0.5s+1.0d=45.
Multiply the finishing equation by 3: 1.5s+3.0d=135.
Subtract the assembly equation: (1.5s+3.0d)−(1.5s+2.5d)=135−120⟹0.5d=15⟹d=30.
Substitute d=30 into 0.5s+1.0(30)=45⟹0.5s=15⟹s=30.
The system is {1.5s+2.5d=120,0.5s+1.0d=45, and a non-negative schedule exists at (s,d)=(30,30).
NEXT STEPS
Final Takeaways from Your TeacherPractice building resource-allocation equations by explicitly setting up a two-way data table (rows = resources, columns = products, final column = total capacity).
Perform a sanity check on solutions: if a linear manufacturing problem yields an extreme negative quantity like −1020, check whether constants or coefficients were swapped during setup.
Foundational Rules & Step-by-Step Breakdown
Define the Variables
Let s represent the number of standard chairs produced, and let d represent the number of deluxe chairs produced.
Set Up the Equations for Each Resource
Each type of chair consumes hours from two distinct resource pools: assembly and finishing.
-
Assembly Labor:
- Each standard chair takes 1.5 hours.
- Each deluxe chair takes 2.5 hours.
- The total assembly time allocated is 120 hours.
Equating total consumed assembly hours to total available assembly hours gives: 1.5s+2.5d=120
-
Finishing Labor:
- Each standard chair takes 0.5 hours.
- Each deluxe chair takes 1.0 hour.
- The total finishing time allocated is 45 hours.
Equating total consumed finishing hours to total available finishing hours gives: 0.5s+1.0d=45
Together, the system representing simultaneous capacity saturation is: {1.5s+2.5d=120,0.5s+1.0d=45
Solve the System of Linear Equations
To eliminate s, multiply the entire finishing equation by 3: 3(0.5s+1.0d)=3(45)⟹1.5s+3.0d=135
Subtract the assembly equation from this new equation: (1.5s+3.0d)−(1.5s+2.5d)=135−120 0.5d=15 d=0.515=30
Substitute d=30 back into the finishing equation to solve for s: 0.5s+1.0(30)=45 0.5s+30=45 0.5s=15 s=0.515=30
Verify Feasibility
In real-world manufacturing constraints, production quantities must be non-negative (s≥0, d≥0) and represent whole units. Since both s=30 and d=30 are non-negative integers, an exact boundary saturation schedule exists at (s,d)=(30,30), successfully utilizing all 120 assembly hours and all 45 finishing hours with zero idle time.
Check Final Answer
Let s and d denote the number of standard and deluxe chairs produced, respectively.
The system modeling boundary saturation is: {1.5s+2.5d=1200.5s+1.0d=45.
Solving this system yields s=30 standard chairs and d=30 deluxe chairs.
Since both values are non-negative integers, an exact boundary saturation schedule exists at (s,d)=(30,30).
Lock It In
In a real-world resource allocation problem, how should you group coefficients into equations?
Group by shared resource pool (one equation per limited resource, with terms summing contributions from all products), never by product type.
Similar Questions & Related Knowledge
Similar Questions
A bakery makes artisan loaves (x) and baguettes (y). Each loaf requires 4 cups of flour and 1 packet of yeast. Each baguette requires 3 cups of flour and 1 packet of yeast. The bakery has 110 cups of flour and 32 packets of yeast. Write the system of linear equations and find the non-negative production schedule (x,y) that uses all ingredients exactly.
Answer
The system is {4x+3y=110,x+y=32. Subtracting 3(x+y=32) from the flour equation yields x=110−96=14. Then y=32−14=18. The production schedule is (x,y)=(14,18).
A tech workshop builds gaming rigs (g) and office desktops (d). Each gaming rig takes 3 hours of wiring and 2 hours of testing. Each office desktop takes 1 hour of wiring and 1.5 hours of testing. The workshop has 48 hours allocated for wiring and 44 hours for testing. Write the system of equations and determine if an exact boundary schedule exists with non-negative whole computers.
Answer
The system is {3g+1d=48,2g+1.5d=44. From the first equation, d=48−3g. Substitute into the second: 2g+1.5(48−3g)=44⟹−2.5g+72=44⟹2.5g=28⟹g=11.2. Since g=11.2 is not an integer, no exact whole-unit schedule exists.
A tailor produces vests (v) and coats (c). Each vest requires 1.2 m of wool, 0.8 m of lining, and 4 buttons. Each coat requires 2.5 m of wool, 2.0 m of lining, and 6 buttons. Available stock includes 49 m of wool and 36 m of lining. Write the two-variable system modeling complete wool and lining saturation, solve for (v,c), and calculate how many buttons are needed for this exact run.
Answer
The system is {1.2v+2.5c=49,0.8v+2.0c=36. Multiply the first by 4 and the second by 5: 4.8v+10c=196 and 4.0v+10c=180. Subtracting gives 0.8v=16⟹v=20. Then 2.0c=36−0.8(20)=20⟹c=10. Total buttons required: 4(20)+6(10)=140 buttons.
Related Knowledge
- 01Write systems of equations from real-world situations
- 02Solve systems of equations graphically
- 03Solve Systems of Three Linear Equations
- 04Solve Systems by Substitution
- 05Solve mixture, rate, cost, and work problems using systems of equations
- 06Write Exponential Functions from Tables, Graphs, or Situations