A fisheries biologist conducts a mark-recapture survey on an isolated population of brook trout (Salvelinus fontinalis) inhabiting a subalpine tarn. The biologist marks and releases an initial sample of M=30 trout. In a subsequent sampling pass, C=25 trout are captured, of which only R=2 are marked. Because the number of recaptures is small (R<7), the standard Lincoln-Petersen estimator N^=RM⋅C exhibits significant positive small-sample bias. To correct for this boundary condition, Chapman's modified estimator is applied: N^C=R+1(M+1)(C+1)−1, with estimated variance Var(N^C)=(R+1)2(R+2)(M+1)(C+1)(M−R)(C−R). Calculate: (a) the standard Lincoln-Petersen estimate N^, (b) the Chapman-corrected estimate N^C, and (c) the standard error SE(N^C)=Var(N^C).
A fisheries biologist conducts a mark-recapture survey on an isolated population of brook trout (Salvelinus fontinalis) inhabiting a subalpine tarn. The biologist marks and releases an initial sample of M=30 trout. In a subsequent sampling pass, C=25 trout are captured, of which only R=2 are marked. Because the number of recaptures is small (R<7), the standard Lincoln-Petersen estimator N^=RM⋅C exhibits significant positive small-sample bias. To correct for this boundary condition, Chapman's modified estimator is applied: N^C=R+1(M+1)(C+1)−1, with estimated variance Var(N^C)=(R+1)2(R+2)(M+1)(C+1)(M−R)(C−R). Calculate: (a) the standard Lincoln-Petersen estimate N^, (b) the Chapman-corrected estimate N^C, and (c) the standard error SE(N^C)=Var(N^C).
Common Mistakes & Teacher Diagnosis
01 The student forgets to subtract 1 at the end of Chapman's formula, overestimating N̂_C by 1.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 11
N^=230⋅25⟹N^=2750=375
- Step 22
N^C=2+1(30+1)(25+1)⟹N^C=331⋅26⟹N^C=3806≈268.67
CorrectN^C=R+1(M+1)(C+1)−1=331⋅26−1=3806−1≈267.67≈268_
You omitted the −1 term at the end of Chapman's modified estimator formula, leading to an estimate that is 1 unit too high.
Made a similar mistake?Check my work on ACEpath → - Step 33
Var(N^C)=(2+1)2(2+2)31⋅26⋅(30−2)(25−2)=9⋅4806⋅28⋅23=36518672≈14407.56_
CorrectVar(N^C)=36(31)(26)(28)(23)=36519064≈14418.44_
You set up the variance formula correctly, but made an arithmetic multiplication error when evaluating 806⋅28⋅23, getting 518672 instead of 519064.
- Step 44
SE(N^C)=14407.56≈120.03_
CorrectSE(N^C)=14418.44≈119–120_
You correctly took the square root of your calculated variance, but the numerical value carries forward the multiplication error from the previous step.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly identified the parameters M=30, C=25, and R=2 from the problem statement.
You accurately calculated the standard Lincoln-Petersen estimate in part (a).
You chose and correctly substituted the survey parameters into the Chapman variance formula.
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou dropped the trailing −1 in Chapman's formula and miscalculated the product 806⋅28⋅23.
WHY IT HAPPENED
ACEpath Teacher's DiagnosisChapman's estimator adds 1 to each count in the ratio to reduce positive bias when recaptures are small, but it requires subtracting 1 at the end to make the expectation unbiased (E[N^C]=N). Omitting this final term is a common formula recall slip._
REASONING PATH
Your ACEpath teacher’s suggested approach- Check the Chapman Correction Term
Chapman's estimator is defined as N^C=R+1(M+1)(C+1)−1._
Always verify that you subtract 1 after computing the quotient R+1(M+1)(C+1).
- Verify Multi-Digit Products
806⋅644=519,064.
Break down large products into smaller components or double-check intermediate arithmetic before dividing.
CORRECTED PATH
ACEpath Teacher's DemonstrationApply Chapman's complete formula: N^C=2+1(30+1)(25+1)−1=3806−1≈267.67≈268 trout._
Recalculate the numerator for variance: 806⋅28⋅23=806⋅644=519,064.
Divide by the denominator: Var(N^C)=36519,064≈14,418.44._
Take the square root for the standard error: SE(N^C)=14,418.44≈120.08≈119–120 trout._
(a) N^=375 trout; (b) N^C=268 trout; (c) SE(N^C)=119–120 trout
NEXT STEPS
Final Takeaways from Your TeacherMemorize the structure of Chapman's formula by pairing '+1 to each term inside' with 'subtract 1 at the end'.
Practice using Chapman's estimator and its variance on small-sample mark-recapture datasets to strengthen arithmetic accuracy.
02 The student confuses the standard error with the variance and omits taking the square root in part (c).
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 11
N^=2(30⋅25)=375
- Step 22
N^C=3(31⋅26)−1⟹N^C=3806−1=3803≈267.67
- Step 33
Var(N^C)=32⋅431⋅26⋅28⋅23⟹Var(N^C)=36518672≈14407.56
CorrectVar(N^C)=(R+1)2(R+2)(M+1)(C+1)(M−R)(C−R)=9⋅431⋅26⋅28⋅23=36519,064≈14,418.44_
You substituted the correct terms into Chapman's variance formula, but made a slight arithmetic error when multiplying the numerator terms (31⋅26⋅28⋅23=519,064, not 518,672).
Made a similar mistake?Check my work on ACEpath → - Step 44
SE(N^C)=14407.56_
CorrectSE(N^C)=Var(N^C)=36519,064≈119 trout
You set the standard error equal to the variance rather than taking its square root.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly calculated the Lincoln-Petersen estimate for part (a).
You accurately evaluated Chapman's bias-corrected estimator for part (b).
You selected and correctly substituted into the formula for Chapman's variance in part (c).
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou set SE(N^C) directly equal to Var(N^C), forgetting that standard error is the square root of the variance.
WHY IT HAPPENED
ACEpath Teacher's DiagnosisYou conflated variance with standard error/standard deviation, overlooking the dimensional discrepancy where variance is expressed in squared units (exttrout2) while standard error must be in linear units (exttrout).
REASONING PATH
Your ACEpath teacher’s suggested approach- Check Units and Dimensions
Variance has squared units (extindividuals2), whereas standard error represents the dispersion on the original scale (extindividuals).
Always convert variance to standard error by taking the principal square root: SE=Var.
CORRECTED PATH
ACEpath Teacher's DemonstrationRecalculate the numerator of the variance: 31⋅26⋅28⋅23=806⋅644=519,064.
Divide by the denominator: Var(N^C)=36519,064≈14,418.44._
Take the square root to determine the standard error: SE(N^C)=14,418.44≈120.08 trout (or ≈119 trout using exact rational rounding)._
SE(N^C)≈119 trout (or 120 trout)_
NEXT STEPS
Final Takeaways from Your TeacherDouble-check long multiplication steps or use factor cancellation before multiplying large numbers.
Label statistical units explicitly at each stage to remind yourself when a square root is required.
03 The student neglects the square on (R + 1) in the denominator of the variance formula, dividing by (R + 1)(R + 2) instead of (R + 1)²(R + 2).
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 11
N^=2(30⋅25)=375
- Step 22
N^C=3(31⋅26)−1=3803≈267.67_
- Step 33
Var(N^C)=(2+1)(2+2)31⋅26⋅28⋅23⟹Var(N^C)=12518672≈43222.67
CorrectVar(N^C)=(R+1)2(R+2)(M+1)(C+1)(M−R)(C−R)=32⋅431⋅26⋅28⋅23=36519064≈14418.44_
You omitted the square on (R+1) in the denominator, evaluating (2+1)(2+2)=12 instead of (2+1)2(2+2)=36.
Made a similar mistake?Check my work on ACEpath → - Step 44
SE(N^C)=43222.67≈207.90_
CorrectSE(N^C)=Var(N^C)=14418.44≈119–120 trout
You took the square root correctly, but the resulting standard error was inflated due to the denominator error in the variance step.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly computed the standard Lincoln-Petersen estimate.
You accurately applied Chapman's estimator and handled the subtraction of 1.
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou wrote (2+1)(2+2) in the denominator instead of (2+1)2(2+2).
WHY IT HAPPENED
ACEpath Teacher's DiagnosisYou overlooked the power of 2 on the (R+1) term in Chapman's variance formula, dividing by (R+1)(R+2) rather than (R+1)2(R+2).
REASONING PATH
Your ACEpath teacher’s suggested approach- Chapman Variance Formula Structure
Var(N^C)=(R+1)2(R+2)(M+1)(C+1)(M−R)(C−R)_
Double-check that the first factor in the denominator is squared: (R+1)2, not (R+1).
CORRECTED PATH
ACEpath Teacher's DemonstrationCompute the denominator: (R+1)2(R+2)=32⋅4=9⋅4=36.
Compute the numerator: 31⋅26⋅28⋅23=806⋅644=519064.
Calculate the variance: Var(N^C)=36519064≈14418.44._
Take the square root to find the standard error: SE(N^C)=14418.44≈120 trout (or 119 depending on rounding)._
(a) N^=375 trout; (b) N^C=268 trout; (c) SE(N^C)=119–120 trout
NEXT STEPS
Final Takeaways from Your TeacherWrite down (R+1)2 explicitly as (R+1)(R+1) during scratch work to avoid dropping the square.
Check whether your variance denominator has three total linear factors of R terms: (R+1), (R+1), and (R+2).
Foundational Rules & Step-by-Step Breakdown
Identify the Given Survey Parameters
From the mark-recapture survey data:
- Number of trout marked and released initially: M=30
- Total number of trout captured in the second sample: C=25
- Number of marked trout recaptured in the second sample: R=2
(a) Calculate the Lincoln-Petersen Estimate (N^)
The standard Lincoln-Petersen estimator assumes that the proportion of marked individuals in the second sample equals the proportion of marked individuals in the entire population: CR=NM⟹N^=RM⋅C
Substitute the values: N^=230⋅25=2750=375 trout
(b) Calculate Chapman's Modified Estimate (N^C)_
When recaptures are small (R<7), the Lincoln-Petersen formula systematically overestimates population size. Chapman's estimator reduces this small-sample bias by adjusting the numerator and denominator: N^C=R+1(M+1)(C+1)−1
Substitute the values: N^C=2+1(30+1)(25+1)−1=331⋅26−1
Compute the numerator and evaluate: 3806−1≈268.67−1=267.67
Rounding to the nearest whole fish gives: N^C=268 trout
(c) Calculate the Standard Error (SE(N^C))_
The estimated variance of Chapman's estimator is given by: Var(N^C)=(R+1)2(R+2)(M+1)(C+1)(M−R)(C−R)
Evaluate each component:
- (M+1)(C+1)=31⋅26=806
- (M−R)=30−2=28
- (C−R)=25−2=23
- Denominator: (R+1)2(R+2)=32⋅4=9⋅4=36
Multiply the numerator terms: 806⋅28⋅23=519,064
Compute the variance: Var(N^C)=36519,064≈14,418.44
The standard error is the square root of the estimated variance: SE(N^C)=Var(N^C)=36519,064≈119–120 trout
Rounding according to standard survey reporting yields: SE(N^C)=119 trout
Check Final Answer
(a) N^=375 trout
(b) N^C=268 trout_
(c) SE(N^C)=119 trout_
Lock It In
What is the complete formula for Chapman's modified mark-recapture estimator?
N^C=R+1(M+1)(C+1)−1. Remember to add 1 to each count, then subtract 1 from the entire fraction._
Similar Questions & Related Knowledge
Similar Questions
A wildlife biologist marks M=19 salamanders in a wetland. In a second survey, C=11 salamanders are caught, of which R=3 are marked. Calculate Chapman's estimate N^C._
Answer
N^C=3+1(19+1)(11+1)−1=420⋅12−1=60−1=59 salamanders._
In a study of an endangered lizard, M=15 individuals are marked. Later, C=17 lizards are captured, with R=2 marked recaptures. Calculate (a) the Lincoln-Petersen estimate N^ and (b) Chapman's estimate N^C, then compare the difference._
Answer
(a) N^=215⋅17=127.5≈128; (b) N^C=3(16)(18)−1=96−1=95. The Lincoln-Petersen estimator overestimates the population by about 33 lizards due to small-sample bias._
An ecologist tags M=40 songbirds. A secondary netting yields C=30 birds with R=4 recaptures. Calculate Chapman's estimate N^C and its estimated variance Var(N^C)=(R+1)2(R+2)(M+1)(C+1)(M−R)(C−R).
Answer
N^C=5(41)(31)−1=51271−1=254.2−1≈253 birds. Var(N^C)=52⋅6(41)(31)(36)(26)=25⋅61271⋅936=1501,189,656≈7931.04.