Resources

An overhead warehouse crane operates with a constant mechanical output power of P=5.40 kWP = 5.40\text{ kW}. A sensor records that the crane hoists a dense steel crate vertically upward from rest to a height of h=14.0 mh = 14.0\text{ m} in Δt=8.50 s\Delta t = 8.50\text{ s}, reaching an upward speed of vf=2.40 m/sv_f = 2.40\text{ m/s} at that height. Assuming g=9.80 m/s2g = 9.80\text{ m/s}^2 and neglecting dissipative cable resistance, determine the mass mm of the crate.

Answer and steps

Final answer

m=328 kgm = 328\text{ kg}

Steps

01

Calculate the total work delivered by the crane

Method: Work-Energy Principle

To find the mass of the crate, relate the total mechanical energy delivered by the crane to the mechanical energy gained by the crate.

Power is the rate at which work is done over time (P=WΔtP = \frac{W}{\Delta t}). For a constant mechanical output power PP over a time interval Δt\Delta t, the total work done by the crane cable is: W=PΔtW = P \Delta t

Convert the given power into watts: P=5.40 kW=5.40×103 W=5400 WP = 5.40\text{ kW} = 5.40 \times 10^3\text{ W} = 5400\text{ W}

Calculate the total work input: W=(5400 W)(8.50 s)=45 900 JW = (5400\text{ W})(8.50\text{ s}) = 45\,900\text{ J}


02

Formulate the change in mechanical energy

By the work-energy theorem, neglecting any dissipative forces, the external work done by the crane equals the total change in mechanical energy (ΔEmech\Delta E_{\text{mech}}) of the crate: W=ΔK+ΔUgW = \Delta K + \Delta U_g

Since the crate starts from rest (vi=0v_i = 0), the change in kinetic energy is: ΔK=12mvf2−0=12mvf2\Delta K = \frac{1}{2} m v_f^2 - 0 = \frac{1}{2} m v_f^2

Taking the initial release point as the reference height (y=0y = 0), the change in gravitational potential energy is: ΔUg=mgh\Delta U_g = m g h

Combining these gives: W=m(12vf2+gh)W = m \left(\frac{1}{2} v_f^2 + g h\right)

Common Pitfall: Assuming the upward acceleration is constant. Because the crane operates at constant power rather than constant force, the acceleration varies over time. Using kinematic equations for constant acceleration would yield an incorrect result; the work-energy principle must be used instead.


03

Solve for the mass mm

Substitute the numerical values for the specific energy terms: 12vf2=12(2.40 m/s)2=2.88 J/kg\frac{1}{2} v_f^2 = \frac{1}{2} (2.40\text{ m/s})^2 = 2.88\text{ J/kg} gh=(9.80 m/s2)(14.0 m)=137.20 J/kgg h = (9.80\text{ m/s}^2)(14.0\text{ m}) = 137.20\text{ J/kg}

Add the two contributions per unit mass: 12vf2+gh=2.88 J/kg+137.20 J/kg=140.08 J/kg\frac{1}{2} v_f^2 + g h = 2.88\text{ J/kg} + 137.20\text{ J/kg} = 140.08\text{ J/kg}

Now solve for mm: m=W12vf2+gh=45 900 J140.08 J/kg≈327.67 kgm = \frac{W}{\frac{1}{2} v_f^2 + g h} = \frac{45\,900\text{ J}}{140.08\text{ J/kg}} \approx 327.67\text{ kg}

Rounding to three significant figures gives: m=328 kgm = 328\text{ kg}

Typical errors

OverviewACEpath Teacher's Diagnosis

01 The student equates the total work done solely to the change in gravitational potential energy, neglecting the final kinetic energy.

Sample Student Work

Reviewed by ACEpath Teacher
Step-by-Step Review
Walk Through It with Your Teacher
Incorrect
  1. Step 1

    W=PΔt=5400×8.50=45900 JW = P \Delta t = 5400 \times 8.50 = 45900\text{ J}

  2. Step 2

    W=mgh  ⟹  45900=m×9.80×14.0=137.2mW = mgh \implies 45900 = m \times 9.80 \times 14.0 = 137.2m

    Correct

    W=ΔK+ΔUg=12mvf2+mghW = \Delta K + \Delta U_g = \frac{1}{2}mv_f^2 + mgh

    Because the crate accelerates from rest to an upward speed of vf=2.40 m/sv_f = 2.40\text{ m/s}, part of the work goes into kinetic energy. The total work must equal ΔK+ΔUg\Delta K + \Delta U_g, not just mghmgh.

  3. Step 3

    m=45900137.2≈335 kgm = \frac{45900}{137.2} \approx 335\text{ kg}

    Correct

    m=W12vf2+gh=45 9002.88+137.20≈328 kgm = \frac{W}{\frac{1}{2}v_f^2 + gh} = \frac{45\,900}{2.88 + 137.20} \approx 328\text{ kg}

    Your algebraic division and rounding followed correctly from your previous formula, but the numerical result is off because the kinetic energy term was omitted.

WHAT YOU DID WELL
Compliments from Your Teacher

You correctly calculated the total work delivered by the crane using W=PΔtW = P \Delta t.

You accurately computed the gravitational potential energy per unit mass as gh=137.2 J/kggh = 137.2\text{ J/kg}.

You solved the resulting linear equation for mm with correct arithmetic.

THE ERROR
Where Your ACEpath Teacher Spotted the Mistake
Omission of Kinetic Energy in Work-Energy Balance

no

WHY IT HAPPENED
ACEpath Teacher's Diagnosis

You assumed that lifting an object means all input work converts strictly into gravitational potential energy (W=mghW = mgh), forgetting to check whether the object is also moving at the final height (vf>0v_f > 0).

REASONING PATH
Your ACEpath teacher’s suggested approach
Work-Energy Accounting
  • When an external lifting force acts on an object that changes speed, external work equals the total change in mechanical energy: Wext=ΔK+ΔUgW_{\text{ext}} = \Delta K + \Delta U_g.

  • Always list both the initial and final states (vi,vf,yi,yfv_i, v_f, y_i, y_f) before writing the energy balance equation.

CORRECTED PATH
ACEpath Teacher's Demonstration
  1. Write the complete work-energy equation including kinetic energy: W=12mvf2+mghW = \frac{1}{2}mv_f^2 + mgh.

  2. Factor out mass mm: W=m(12vf2+gh)W = m\left(\frac{1}{2}v_f^2 + gh\right).

  3. Evaluate the specific energy terms: 12vf2=12(2.40 m/s)2=2.88 J/kg\frac{1}{2}v_f^2 = \frac{1}{2}(2.40\text{ m/s})^2 = 2.88\text{ J/kg} and gh=(9.80 m/s2)(14.0 m)=137.20 J/kggh = (9.80\text{ m/s}^2)(14.0\text{ m}) = 137.20\text{ J/kg}.

  4. Sum the energy terms: 2.88 J/kg+137.20 J/kg=140.08 J/kg2.88\text{ J/kg} + 137.20\text{ J/kg} = 140.08\text{ J/kg}.

  5. Divide total work by specific energy: m=45 900 J140.08 J/kg≈327.67 kgm = \frac{45\,900\text{ J}}{140.08\text{ J/kg}} \approx 327.67\text{ kg}.

Final answer

m=328 kgm = 328\text{ kg}

NEXT STEPS
Final Takeaways from Your Teacher
  • Before setting W=mghW = mgh, inspect the problem statement to see if the object reaches a non-zero final speed.

  • Practice setting up the general work-energy relation Wext=ΔK+ΔUgW_{\text{ext}} = \Delta K + \Delta U_g as your default starting point for hoisting problems.

OverviewACEpath Teacher's Diagnosis

02 The student forgets to square the final velocity when calculating the kinetic energy term.

Sample Student Work

Reviewed by ACEpath Teacher
Step-by-Step Review
Walk Through It with Your Teacher
Incorrect
  1. Step 1

    W=PΔt=5400×8.50=45900 JW = P \Delta t = 5400 \times 8.50 = 45900\text{ J}

  2. Step 2

    W=12mvf+mgh  ⟹  45900=12m(2.40)+m(9.80)(14.0)  ⟹  45900=1.20m+137.2m=138.4mW = \frac{1}{2}mv_f + mgh \implies 45900 = \frac{1}{2}m(2.40) + m(9.80)(14.0) \implies 45900 = 1.20m + 137.2m = 138.4m

    Correct

    W=12mvf2+mgh  ⟹  45900=12m(2.40)2+m(9.80)(14.0)=2.88m+137.2m=140.08mW = \frac{1}{2}mv_f^2 + mgh \implies 45900 = \frac{1}{2}m(2.40)^2 + m(9.80)(14.0) = 2.88m + 137.2m = 140.08m

    Kinetic energy is given by K=12mv2K = \frac{1}{2}mv^2, not 12mv\frac{1}{2}mv. Forgetting to square the final speed vf=2.40 m/sv_f = 2.40\text{ m/s} gave 1.20 J/kg1.20\text{ J/kg} instead of 2.88 J/kg2.88\text{ J/kg} for the specific kinetic energy.

  3. Step 3

    m=45900138.4≈332 kgm = \frac{45900}{138.4} \approx 332\text{ kg}

    Correct

    m=45900140.08≈328 kgm = \frac{45900}{140.08} \approx 328\text{ kg}

    Your algebraic isolation of mm and arithmetic division were carried out correctly, but the numerical result was affected by the missing square in Step 2.

WHAT YOU DID WELL
Compliments from Your Teacher

You correctly related mechanical power and time to find the total work input.

You correctly identified that the crane's work equals the sum of the changes in kinetic and potential energy.

You calculated the gravitational potential energy term mghmgh accurately.

THE ERROR
Where Your ACEpath Teacher Spotted the Mistake
Formula recall error: missing exponent in kinetic energy

You wrote 12mv\frac{1}{2}mv instead of 12mv2\frac{1}{2}mv^2 when defining the crate's kinetic energy.

WHY IT HAPPENED
ACEpath Teacher's Diagnosis

You conflated momentum (mvmv) or average velocity concepts with translational kinetic energy (K=12mv2K = \frac{1}{2}mv^2), dropping the quadratic dependence on speed.

REASONING PATH
Your ACEpath teacher’s suggested approach
Check physical dimensions and units
  • Every additive term in an energy equation must have dimensions of energy (kg⋅m2/s2\text{kg}\cdot\text{m}^2/\text{s}^2, or Joules).

  • Notice that 12mv\frac{1}{2}mv has units of kg⋅m/s\text{kg}\cdot\text{m/s} (momentum), whereas mghmgh has units of kg⋅m2/s2\text{kg}\cdot\text{m}^2/\text{s}^2 (energy). Checking units catches missing squares immediately.

CORRECTED PATH
ACEpath Teacher's Demonstration
  1. Write the correct work-energy balance with the squared speed: W=ΔK+ΔUg=12mvf2+mghW = \Delta K + \Delta U_g = \frac{1}{2}mv_f^2 + mgh.

  2. Factor out the mass: W=m(12vf2+gh)W = m\left(\frac{1}{2}v_f^2 + gh\right).

  3. Evaluate the specific energy terms: 12(2.40 m/s)2+(9.80 m/s2)(14.0 m)=2.88 J/kg+137.20 J/kg=140.08 J/kg\frac{1}{2}(2.40\text{ m/s})^2 + (9.80\text{ m/s}^2)(14.0\text{ m}) = 2.88\text{ J/kg} + 137.20\text{ J/kg} = 140.08\text{ J/kg}.

  4. Solve for mm: m=45900 J140.08 J/kg≈327.67 kgm = \frac{45900\text{ J}}{140.08\text{ J/kg}} \approx 327.67\text{ kg}.

Final answer

m=328 kgm = 328\text{ kg}

NEXT STEPS
Final Takeaways from Your Teacher
  • Always write down the general formula K=12mv2K = \frac{1}{2}mv^2 before substituting numerical values.

  • Perform a quick dimensional analysis on each term before adding them together to make sure momentum is not being added to energy.

OverviewACEpath Teacher's Diagnosis

03 The student misuses the average power relation for constant velocity by calculating average force as F = P / v_f, assuming the final speed is maintained throughout.

Sample Student Work

Reviewed by ACEpath Teacher
Step-by-Step Review
Walk Through It with Your Teacher
Incorrect
  1. Step 1

    F=Pvf=54002.40=2250 NF = \frac{P}{v_f} = \frac{5400}{2.40} = 2250\text{ N}

    Correct

    W=PΔt=(5400 W)(8.50 s)=45 900 JW = P\Delta t = (5400\text{ W})(8.50\text{ s}) = 45\,900\text{ J}

    You used the formula F=PvfF = \frac{P}{v_f}, which gives only the instantaneous tension at the final instant when v=vfv = v_f. Since the crate accelerates from rest, its speed and upward force change continuously throughout the lift, so this does not represent an overall force for the motion.

  2. Step 2

    F=mg  ⟹  m=22509.80≈230 kgF = mg \implies m = \frac{2250}{9.80} \approx 230\text{ kg}

    Correct

    W=m(12vf2+gh)  ⟹  m=45 90012(2.40)2+(9.80)(14.0)=328 kgW = m\left(\frac{1}{2}v_f^2 + gh\right) \implies m = \frac{45\,900}{\frac{1}{2}(2.40)^2 + (9.80)(14.0)} = 328\text{ kg}

    You set the calculated force equal to the crate's weight (F=mgF = mg). Because the crate was accelerating upward, the lifting force was not simply balancing gravity, and using this single force led to an incorrect mass.

WHAT YOU DID WELL
Compliments from Your Teacher

You correctly converted the power from 5.40 kW5.40\text{ kW} to 5400 W5400\text{ W}.

You correctly performed the division 54002.40=2250\frac{5400}{2.40} = 2250.

THE ERROR
Where Your ACEpath Teacher Spotted the Mistake
Misapplied Instantaneous Power Relation

no

WHY IT HAPPENED
ACEpath Teacher's Diagnosis

You treated the crate's motion as steady-state lifting at constant speed (F=mgF = mg and P=FvP = Fv) instead of recognizing that constant power with changing speed requires integrating over time via the work-energy principle (W=PΔtW = P\Delta t).

REASONING PATH
Your ACEpath teacher’s suggested approach
Constant Power vs. Constant Force
  • When power PP is constant over a time interval Δt\Delta t, total work is W=PΔtW = P\Delta t, while instantaneous force F(t)=Pv(t)F(t) = \frac{P}{v(t)} varies inversely with speed.

  • Check whether speed is changing; if it is, use energy conservation rather than a single force value.

Work-Energy Balance
  • Total work done on the object equals its change in kinetic and potential energy: W=ΔK+ΔUgW = \Delta K + \Delta U_g.

  • Equate PΔtP\Delta t to 12mvf2+mgh\frac{1}{2}mv_f^2 + mgh and factor out mass mm.

CORRECTED PATH
ACEpath Teacher's Demonstration
  1. Calculate total work done by the crane: W=PΔt=(5400 W)(8.50 s)=45 900 JW = P\Delta t = (5400\text{ W})(8.50\text{ s}) = 45\,900\text{ J}.

  2. Write the work-energy equation: W=12mvf2+mgh=m(12vf2+gh)W = \frac{1}{2}mv_f^2 + mgh = m\left(\frac{1}{2}v_f^2 + gh\right).

  3. Evaluate specific energy gained: 12vf2+gh=12(2.40 m/s)2+(9.80 m/s2)(14.0 m)=2.88+137.20=140.08 J/kg\frac{1}{2}v_f^2 + gh = \frac{1}{2}(2.40\text{ m/s})^2 + (9.80\text{ m/s}^2)(14.0\text{ m}) = 2.88 + 137.20 = 140.08\text{ J/kg}.

  4. Solve for mass: m=45 900 J140.08 J/kg≈327.67 kgm = \frac{45\,900\text{ J}}{140.08\text{ J/kg}} \approx 327.67\text{ kg}.

Final answer

m=328 kgm = 328\text{ kg}

NEXT STEPS
Final Takeaways from Your Teacher
  • Review the distinction between instantaneous power (P=FvP = Fv) and total work done over a duration (W=PΔtW = P\Delta t).

  • Practice applying the work-energy theorem (Wext=ΔK+ΔUW_{\text{ext}} = \Delta K + \Delta U) to variable-force lifting problems.

Lock it in

Similar question

01

A hoist powered by a motor delivers 12.0 kJ12.0\text{ kJ} of net mechanical work to lift a crate vertically from rest to a height of 8.00 m8.00\text{ m}. At that height, the crate has an upward speed of 2.00 m/s2.00\text{ m/s}. Taking g=9.80 m/s2g = 9.80\text{ m/s}^2, find the mass of the crate.

Answer

m=149 kgm = 149\text{ kg}. Key steps:

  1. W=ΔK+ΔUg=m(12vf2+gh)W = \Delta K + \Delta U_g = m\left(\frac{1}{2}v_f^2 + gh\right)
  2. 12vf2+gh=12(2.00)2+(9.80)(8.00)=2.00+78.40=80.40 J/kg\frac{1}{2}v_f^2 + gh = \frac{1}{2}(2.00)^2 + (9.80)(8.00) = 2.00 + 78.40 = 80.40\text{ J/kg}
  3. m=12 000 J80.40 J/kg≈149.25 kg≈149 kgm = \frac{12\,000\text{ J}}{80.40\text{ J/kg}} \approx 149.25\text{ kg} \approx 149\text{ kg}.
02

An electric winch lifts a 250 kg250\text{ kg} container vertically from rest at a constant power of P=4.00 kWP = 4.00\text{ kW} for a duration of Δt=6.00 s\Delta t = 6.00\text{ s}. If the container reaches a height of 9.00 m9.00\text{ m}, calculate the upward speed vfv_f of the container at that height. Assume g=9.80 m/s2g = 9.80\text{ m/s}^2 and neglect friction.

Answer

vf=4.40 m/sv_f = 4.40\text{ m/s}. Key steps:

  1. Total work W=PΔt=(4000 W)(6.00 s)=24 000 JW = P \Delta t = (4000\text{ W})(6.00\text{ s}) = 24\,000\text{ J}
  2. Potential energy gain ΔUg=mgh=(250)(9.80)(9.00)=22 050 J\Delta U_g = mgh = (250)(9.80)(9.00) = 22\,050\text{ J}
  3. Kinetic energy gain ΔK=W−ΔUg=24 000−22 050=1950 J\Delta K = W - \Delta U_g = 24\,000 - 22\,050 = 1950\text{ J}
  4. 12mvf2=1950  ⟹  vf=2(1950)250=15.6≈4.40 m/s\frac{1}{2}mv_f^2 = 1950 \implies v_f = \sqrt{\frac{2(1950)}{250}} = \sqrt{15.6} \approx 4.40\text{ m/s}.
03

A motorized lift hoists a 400 kg400\text{ kg} payload from rest to a height of 20.0 m20.0\text{ m} in 10.0 s10.0\text{ s}, reaching a final upward speed of 3.00 m/s3.00\text{ m/s}. If the motor operates with an overall mechanical efficiency of η=80.0%\eta = 80.0\%, determine the required electrical power input PinP_{\text{in}} to the motor. (Use g=9.80 m/s2g = 9.80\text{ m/s}^2).

Answer

Pin=10.0 kWP_{\text{in}} = 10.0\text{ kW}. Key steps:

  1. Mechanical work output Wout=ΔK+ΔUg=12(400)(3.00)2+(400)(9.80)(20.0)=1800 J+78 400 J=80 200 JW_{\text{out}} = \Delta K + \Delta U_g = \frac{1}{2}(400)(3.00)^2 + (400)(9.80)(20.0) = 1800\text{ J} + 78\,400\text{ J} = 80\,200\text{ J}
  2. Mechanical power output Pout=WoutΔt=80 200 J10.0 s=8020 WP_{\text{out}} = \frac{W_{\text{out}}}{\Delta t} = \frac{80\,200\text{ J}}{10.0\text{ s}} = 8020\text{ W}
  3. Input power Pin=Poutη=8020 W0.800=10 025 W≈10.0 kWP_{\text{in}} = \frac{P_{\text{out}}}{\eta} = \frac{8020\text{ W}}{0.800} = 10\,025\text{ W} \approx 10.0\text{ kW}.