Resources

A manufacturing facility operates under two production constraints for producing standard widgets (xx) and premium widgets (yy): a raw materials limitation represented by 3x+5y≤1503x + 5y \le 150, and a labor time limitation represented by 4x+2y≤1004x + 2y \le 100, alongside standard non-negativity constraints x≥0x \ge 0 and y≥0y \ge 0. Construct the system of linear inequalities defining the feasible region, identify the exact boundary coordinates (x,y)(x, y) of all vertices (corner points) of this region, and identify the single critical threshold vertex that maximizes total widget production P(x,y)=x+yP(x, y) = x + y.

Answer and steps

Final answer

System: {3x+5y≤1504x+2y≤100x≥0, y≥0\begin{cases} 3x + 5y \le 150 \\ 4x + 2y \le 100 \\ x \ge 0, \, y \ge 0 \end{cases}; Vertices: (0,0)(0, 0), (25,0)(25, 0), (14.29,21.43)(14.29, 21.43) (exact: (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)), and (0,30)(0, 30); Maximum production vertex: (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right) with P=2507≈35.71 widgetsP = \frac{250}{7} \approx 35.71\text{ widgets}.

Steps

01

Define the System of Inequalities

The manufacturing constraints govern the quantities of standard widgets (xx) and premium widgets (yy). Combining the raw materials, labor, and non-negativity requirements yields the system:

{3x+5y≤150,4x+2y≤100,x≥0,y≥0\lbrace 3x + 5y \le 150, \quad 4x + 2y \le 100, \quad x \ge 0, \quad y \ge 0

Simplifying the labor constraint by dividing by 22 gives: 2x+y≤502x + y \le 50


02

Determine the Vertices (Corner Points) of the Feasible Region

The feasible region lies entirely in the first quadrant (x≥0,y≥0x \ge 0, y \ge 0) bounded by the intersecting lines:

  1. Origin: Intersection of x=0x = 0 and y=0y = 0: (0,0)(0, 0)
  2. xx-axis Intercept (y=0y = 0):

    • Raw materials limit: 3x≤150  ⟹  x≤503x \le 150 \implies x \le 50
    • Labor limit: 4x≤100  ⟹  x≤254x \le 100 \implies x \le 25

    The more restrictive boundary determines the vertex: (25,0)(25, 0)

  3. yy-axis Intercept (x=0x = 0):

    • Raw materials limit: 5y≤150  ⟹  y≤305y \le 150 \implies y \le 30
    • Labor limit: 2y≤100  ⟹  y≤502y \le 100 \implies y \le 50

    The more restrictive boundary determines the vertex: (0,30)(0, 30)

  4. Interior Boundary Intersection: Solve the simultaneous equations representing the boundary lines: {3x+5y=150,2x+y=50\lbrace 3x + 5y = 150, \quad 2x + y = 50

    From the second equation, isolate yy: y=50−2xy = 50 - 2x

    Substitute into the first equation: 3x+5(50−2x)=1503x + 5(50 - 2x) = 150 3x+250−10x=1503x + 250 - 10x = 150 −7x=−100  ⟹  x=1007≈14.29-7x = -100 \implies x = \frac{100}{7} \approx 14.29

    Calculate the corresponding yy-value: y=50−2(1007)=350−2007=1507≈21.43y = 50 - 2\left(\frac{100}{7}\right) = \frac{350 - 200}{7} = \frac{150}{7} \approx 21.43

    This yields the intersection vertex: (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)


03

Evaluate the Objective Function at Each Vertex

By the Fundamental Theorem of Linear Programming, the maximum of the linear objective function P(x,y)=x+yP(x, y) = x + y occurs at one of the corner points of the convex feasible region.

  • At (0,0)(0, 0): P(0,0)=0+0=0P(0, 0) = 0 + 0 = 0
  • At (25,0)(25, 0): P(25,0)=25+0=25P(25, 0) = 25 + 0 = 25
  • At (0,30)(0, 30): P(0,30)=0+30=30P(0, 30) = 0 + 30 = 30
  • At (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right): P(1007,1507)=1007+1507=2507≈35.71P\left(\frac{100}{7}, \frac{150}{7}\right) = \frac{100}{7} + \frac{150}{7} = \frac{250}{7} \approx 35.71

The critical threshold vertex that maximizes total widget production is (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right) (or approximately (14.29,21.43)(14.29, 21.43)), achieving a maximum output of 2507≈35.71 widgets\frac{250}{7} \approx 35.71\text{ widgets}.

Typical errors

OverviewACEpath Teacher's Diagnosis

01 The student misidentifies the boundary intercepts of the feasible region by using the unconstrained intercepts (0, 50) and (50, 0) rather than taking the tighter bounds (0, 30) and (25, 0).

Sample Student Work

Reviewed by ACEpath Teacher
Step-by-Step Review
Walk Through It with Your Teacher
Incorrect
  1. Step 1

    3x+5y≤1503x + 5y \le 150, 4x+2y≤1004x + 2y \le 100, x≥0,y≥0x \ge 0, y \ge 0 ⟹\Longrightarrow xx-intercepts: 1503=50\frac{150}{3} = 50 and 1004=25\frac{100}{4} = 25; yy-intercepts: 1505=30\frac{150}{5} = 30 and 1002=50\frac{100}{2} = 50

  2. Step 2

    2y=100−4x  ⟹  y=50−2x2y = 100 - 4x \implies y = 50 - 2x ⟹\Longrightarrow 3x+5(50−2x)=150  ⟹  −7x=−100  ⟹  x=10073x + 5(50 - 2x) = 150 \implies -7x = -100 \implies x = \frac{100}{7} ⟹\Longrightarrow y=50−2(1007)=1507y = 50 - 2\left(\frac{100}{7}\right) = \frac{150}{7}

  3. Step 3

    Vertices are (0,0)(0, 0), (50,0)(50, 0), (0,50)(0, 50), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    Correct

    Vertices are (0,0)(0, 0), (25,0)(25, 0), (0,30)(0, 30), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    You picked the larger intercepts rather than the smaller, more restrictive intercepts. Because the inequalities require both 3x+5y≤1503x + 5y \le 150 and 4x+2y≤1004x + 2y \le 100, the point (50,0)(50, 0) violates the labor constraint (4(50)+0=200>1004(50) + 0 = 200 > 100) and (0,50)(0, 50) violates the material constraint (0+5(50)=250>1500 + 5(50) = 250 > 150). The feasible region is bounded on the axes by (25,0)(25, 0) and (0,30)(0, 30).

  4. Step 4

    P(0,0)=0P(0, 0) = 0, P(50,0)=50P(50, 0) = 50, P(0,50)=50P(0, 50) = 50, P(1007,1507)=2507≈35.71P\left(\frac{100}{7}, \frac{150}{7}\right) = \frac{250}{7} \approx 35.71 ⟹\Longrightarrow Maximum vertex is (50,0)(50, 0) or (0,50)(0, 50)

    Correct

    P(0,0)=0P(0, 0) = 0, P(25,0)=25P(25, 0) = 25, P(0,30)=30P(0, 30) = 30, P(1007,1507)=2507≈35.71P\left(\frac{100}{7}, \frac{150}{7}\right) = \frac{250}{7} \approx 35.71 ⟹\Longrightarrow Maximum vertex is (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    Your objective function evaluations followed logically from your vertices, but because (50,0)(50, 0) and (0,50)(0, 50) are outside the feasible region, they led to an incorrect maximum vertex.

WHAT YOU DID WELL
Compliments from Your Teacher

You correctly wrote down the full system of inequalities representing the constraints.

You accurately calculated the axis intercepts for each individual boundary line.

You correctly solved the simultaneous linear equations by substitution to find the interior intersection point.

THE ERROR
Where Your ACEpath Teacher Spotted the Mistake
Feasible region intercept selection error

no

WHY IT HAPPENED
ACEpath Teacher's Diagnosis

You selected the outer axis intercepts rather than the tighter, more restrictive bounds needed to satisfy all simultaneous 'less than or equal to' constraints.

REASONING PATH
Your ACEpath teacher’s suggested approach
Testing Candidate Vertices
  • Every vertex of a feasible region must satisfy every inequality in the system, not just the one that produced it.

  • Substitute each candidate axis intercept into all remaining constraints before including it in your list of corner points.

Intersection of Feasible Half-Planes
  • For a system of '≤\le' constraints with positive coefficients in the first quadrant, the feasible region is bounded by the minimum intercept along each axis.

  • When both constraints bound a variable from above along an axis, choose the smaller intercept (e.g., min⁡(25,50)=25\min(25, 50) = 25 on the xx-axis).

CORRECTED PATH
ACEpath Teacher's Demonstration
  1. Determine the feasible xx-axis intercept where y=0y = 0: x≤min⁡(1503,1004)=min⁡(50,25)=25x \le \min\left(\frac{150}{3}, \frac{100}{4}\right) = \min(50, 25) = 25, yielding (25,0)(25, 0).

  2. Determine the feasible yy-axis intercept where x=0x = 0: y≤min⁡(1505,1002)=min⁡(30,50)=30y \le \min\left(\frac{150}{5}, \frac{100}{2}\right) = \min(30, 50) = 30, yielding (0,30)(0, 30).

  3. List all true boundary vertices: (0,0)(0, 0), (25,0)(25, 0), (0,30)(0, 30), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right).

  4. Evaluate P(x,y)=x+yP(x, y) = x + y at each feasible vertex: P(0,0)=0P(0, 0) = 0, P(25,0)=25P(25, 0) = 25, P(0,30)=30P(0, 30) = 30, and P(1007,1507)=2507≈35.71P\left(\frac{100}{7}, \frac{150}{7}\right) = \frac{250}{7} \approx 35.71.

Final answer

The critical threshold vertex that maximizes total production is (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right) with a maximum production value of 2507≈35.71\frac{250}{7} \approx 35.71 widgets.

NEXT STEPS
Final Takeaways from Your Teacher
  • Sketch each boundary line on coordinate axes and shade the overlapping region to visually verify which intercepts bound the shaded region.

  • Always test every candidate corner point against all constraints before evaluating the objective function.

OverviewACEpath Teacher's Diagnosis

02 The student confuses the axis intercepts when finding the boundary corner points, swapping the x and y coordinates of the intercepts.

Sample Student Work

Reviewed by ACEpath Teacher
Step-by-Step Review
Walk Through It with Your Teacher
Partially correct
  1. Step 1

    3x+5y≤1503x + 5y \le 150, 4x+2y≤1004x + 2y \le 100, x≥0x \ge 0, y≥0y \ge 0

  2. Step 2

    For 3x+5y=1503x + 5y = 150, when x=0x = 0, y=30y = 30 ⟹\Longrightarrow For 4x+2y=1004x + 2y = 100, when y=0y = 0, x=25x = 25 ⟹\Longrightarrow Intersection: 3x+5y=1503x + 5y = 150 and 4x+2y=1004x + 2y = 100 gives (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

  3. Step 3

    Vertices are (0,0)(0, 0), (30,0)(30, 0), (0,25)(0, 25), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    Correct

    Vertices are (0,0)(0, 0), (25,0)(25, 0), (0,30)(0, 30), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    You swapped the coordinates when converting your intercept values into ordered pairs (x,y)(x, y). When x=0x = 0 and y=30y = 30, the ordered pair is (0,30)(0, 30), not (30,0)(30, 0). Similarly, when x=25x = 25 and y=0y = 0, the ordered pair is (25,0)(25, 0), not (0,25)(0, 25).

  4. Step 4

    P(0,0)=0P(0, 0) = 0 ⟹\Longrightarrow P(30,0)=30P(30, 0) = 30 ⟹\Longrightarrow P(0,25)=25P(0, 25) = 25 ⟹\Longrightarrow P(1007,1507)=2507≈35.71P\left(\frac{100}{7}, \frac{150}{7}\right) = \frac{250}{7} \approx 35.71 ⟹\Longrightarrow The vertex maximizing total production is (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    Correct

    P(0,0)=0P(0, 0) = 0, P(25,0)=25P(25, 0) = 25, P(0,30)=30P(0, 30) = 30, P(1007,1507)=2507≈35.71P\left(\frac{100}{7}, \frac{150}{7}\right) = \frac{250}{7} \approx 35.71; the maximizing vertex is (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    Because P(x,y)=x+yP(x, y) = x + y is symmetric in xx and yy, your evaluations produced the correct values 2525 and 3030 despite using the swapped points, leading you to the correct optimal vertex.

WHAT YOU DID WELL
Compliments from Your Teacher

You correctly translated the word problem into a precise system of linear inequalities.

You accurately solved the 2×22 \times 2 linear system to obtain the exact fractional coordinates for the boundary intersection.

You correctly evaluated the linear objective function to identify the optimal vertex.

THE ERROR
Where Your ACEpath Teacher Spotted the Mistake
Coordinate order reversal in ordered pairs

You accidentally reversed the xx- and yy-positions when converting single-variable intercepts into (x,y)(x, y) coordinate pairs.

WHY IT HAPPENED
ACEpath Teacher's Diagnosis

Treating coordinate pairs as an unordered collection of values rather than strictly mapping the independent horizontal component to the first position xx and the vertical component to the second position yy.

REASONING PATH
Your ACEpath teacher’s suggested approach
Ordered Pair Mapping
  • Every point in the Cartesian plane is written strictly as (x,y)(x, y). A yy-intercept where x=0x = 0 must be written as (0,y)(0, y), and an xx-intercept where y=0y = 0 must be written as (x,0)(x, 0).

  • Whenever you set a variable to zero to solve for the other, immediately write the coordinate pair with 00 in the slot of the variable you set to zero before continuing.

CORRECTED PATH
ACEpath Teacher's Demonstration
  1. Identify the yy-intercept from x=0x = 0 and y=30y = 30: this corresponds to (0,30)(0, 30).

  2. Identify the xx-intercept from y=0y = 0 and x=25x = 25: this corresponds to (25,0)(25, 0).

  3. Combine these with the origin (0,0)(0, 0) and the intersection (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right) to list all true corner vertices: (0,0)(0, 0), (25,0)(25, 0), (0,30)(0, 30), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right).

Final answer

System: {3x+5y≤1504x+2y≤100x≥0, y≥0\begin{cases} 3x + 5y \le 150 \\ 4x + 2y \le 100 \\ x \ge 0, \, y \ge 0 \end{cases}; Vertices: (0,0)(0, 0), (25,0)(25, 0), (0,30)(0, 30), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right); Maximizing vertex: (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

NEXT STEPS
Final Takeaways from Your Teacher
  • Practice labeling intercept pairs by explicitly writing (x,y)=(0,value)(x, y) = (0, \text{value}) or (x,y)=(value,0)(x, y) = (\text{value}, 0) immediately upon calculation.

  • Plot corner points on a quick hand sketch of the first quadrant to visually confirm that points lying on the yy-axis have x=0x = 0 and points on the xx-axis have y=0y = 0.

OverviewACEpath Teacher's Diagnosis

03 The student makes an algebraic elimination error when solving for the intersection of the two boundary lines, resulting in incorrect intersection coordinates and selecting an incorrect maximizing vertex.

Sample Student Work

Reviewed by ACEpath Teacher
Step-by-Step Review
Walk Through It with Your Teacher
Partially correct
  1. Step 1

    3x + 5y ≤\le 150 \ 4x + 2y ≤\le 100 \ x ≥\ge 0, , y ≥\ge 0   ⟹  \implies Vertices on axes are \text{Vertices on axes are } (0, 0), (25, 0),  and \text{ and } (0, 30)

  2. Step 2

    Solve system: \text{Solve system: } 3x + 5y = 150  and \text{ and } 4x + 2y = 100   ⟹  \implies 10x + 5y = 250   ⟹  \implies (10x + 5y) - (3x + 5y) = 250 - 150   ⟹  \implies 7x = 100   ⟹  \implies x = 1007\frac{100}{7}

  3. Step 3

    4(1007)\left(\frac{100}{7}\right) + 2y = 100   ⟹  \implies 2y = 100 - 4007\frac{400}{7} = 3007\frac{300}{7}   ⟹  \implies y = 3007\frac{300}{7}

    Correct

    2y = 3007\frac{300}{7}   ⟹  \implies y = 3007×2\frac{300}{7 \times 2} = 1507\frac{150}{7}

    You correctly determined that 2y=30072y = \frac{300}{7}, but you forgot to divide both sides by 22 to isolate yy.

  4. Step 4

    Vertices are \text{Vertices are } (0, 0), (25, 0), (0, 30),  and \text{ and } (1007,3007)\left(\frac{100}{7}, \frac{300}{7}\right)

    Correct

    Vertices are \text{Vertices are } (0, 0), (25, 0), (0, 30),  and \text{ and } (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    This list of vertices is affected by the incorrect yy-coordinate calculated in the previous step.

  5. Step 5

    P(0, 0) = 0 \ P(25, 0) = 25 \ P(0, 30) = 30 \ P(1007,3007)\left(\frac{100}{7}, \frac{300}{7}\right) = 4007\frac{400}{7} ≈\approx 57.14   ⟹  \implies The vertex maximizing total production is \text{The vertex maximizing total production is } (1007,3007)\left(\frac{100}{7}, \frac{300}{7}\right)

    Correct

    P(1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right) = 1007\frac{100}{7} + 1507\frac{150}{7} = 2507\frac{250}{7} ≈\approx 35.71   ⟹  \implies Maximum production vertex is \text{Maximum production vertex is } (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right)

    Your evaluation method using the objective function was sound, but the final output value and vertex coordinates carried over your previous calculation error.

WHAT YOU DID WELL
Compliments from Your Teacher

You correctly stated the system of linear inequalities and non-negativity conditions.

You correctly identified the boundary intercepts on both axes.

You used an effective elimination strategy to determine the exact value of xx.

THE ERROR
Where Your ACEpath Teacher Spotted the Mistake
Omitted coefficient division

You simplified the equation to 2y=30072y = \frac{300}{7} and directly copied the fraction as yy without dividing by the coefficient 22.

WHY IT HAPPENED
ACEpath Teacher's Diagnosis

A lapse in the final isolation step of solving a linear equation, leaving a variable coefficient un-cleared when working with fractional right-hand sides.

REASONING PATH
Your ACEpath teacher’s suggested approach
Clear Variable Coefficients
  • For an equation ay=bay = b, dividing both sides by aa gives y=bay = \frac{b}{a}.

  • Always circle or check the coefficient of your variable to ensure it is 11 before recording your final coordinate.

Back-Substitution Verification
  • An intersection point (x,y)(x, y) must satisfy both original boundary equations simultaneously.

  • Substitute your final (x,y)(x, y) pair into the other boundary equation 3x+5y=1503x + 5y = 150 to check whether 3(1007)+5y=1503\left(\frac{100}{7}\right) + 5y = 150 holds.

CORRECTED PATH
ACEpath Teacher's Demonstration
  1. Resume from 2y=30072y = \frac{300}{7}.

  2. Divide both sides by 22: y=3007×2=1507y = \frac{300}{7 \times 2} = \frac{150}{7}.

  3. Assemble the four feasible vertices: (0,0)(0, 0), (25,0)(25, 0), (0,30)(0, 30), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right).

  4. Evaluate P(x,y)=x+yP(x, y) = x + y at the intersection vertex: P(1007,1507)=1007+1507=2507≈35.71P\left(\frac{100}{7}, \frac{150}{7}\right) = \frac{100}{7} + \frac{150}{7} = \frac{250}{7} \approx 35.71.

Final answer

The vertices are (0,0)(0, 0), (25,0)(25, 0), (0,30)(0, 30), and (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right); the vertex maximizing total production is (1007,1507)\left(\frac{100}{7}, \frac{150}{7}\right) with P=2507≈35.71P = \frac{250}{7} \approx 35.71.

NEXT STEPS
Final Takeaways from Your Teacher
  • Practice isolating variables with integer coefficients when the other side is a fraction.

  • Perform a quick substitution check of your solved (x,y)(x, y) pair into both original equations before evaluating the objective function.

Lock it in

Similar question

01

Find all corner points (vertices) of the feasible region defined by x+y≤12x + y \le 12, 3x+y≤243x + y \le 24, x≥0x \ge 0, and y≥0y \ge 0.

Answer

The vertices are (0,0)(0, 0), (8,0)(8, 0), (6,6)(6, 6), and (0,12)(0, 12).\nKey steps: xx-intercepts are 1212 and 243=8\frac{24}{3} = 8, so the tighter bound is (8,0)(8, 0). yy-intercepts are 1212 and 2424, so the tighter bound is (0,12)(0, 12). Solving x+y=12x + y = 12 and 3x+y=243x + y = 24 gives 2x=12  ⟹  x=6,y=62x = 12 \implies x = 6, y = 6.

02

A company makes desks (xx) and chairs (yy) subject to wood constraints 2x+y≤402x + y \le 40 and finishing constraints x+2y≤50x + 2y \le 50, with x,y≥0x, y \ge 0. Identify all vertices of the feasible region and find the maximum of P(x,y)=3x+2yP(x, y) = 3x + 2y.

Answer

Vertices: (0,0)(0, 0), (20,0)(20, 0), (10,20)(10, 20), and (0,25)(0, 25). Maximum is 7070 at (10,20)(10, 20).\nKey steps: xx-intercepts are min⁡(20,50)=20\min(20, 50) = 20; yy-intercepts are min⁡(40,25)=25\min(40, 25) = 25. Intersect lines: 2(50−2y)+y=40  ⟹  100−3y=40  ⟹  y=20,x=102(50 - 2y) + y = 40 \implies 100 - 3y = 40 \implies y = 20, x = 10. Evaluate PP: P(0,0)=0P(0,0)=0, P(20,0)=60P(20,0)=60, P(0,25)=50P(0,25)=50, P(10,20)=3(10)+2(20)=70P(10,20)=3(10)+2(20)=70.

03

Given constraints x+3y≤18x + 3y \le 18, 2x+y≤162x + y \le 16, and x+y≤10x + y \le 10 with x,y≥0x, y \ge 0: find the vertices of the feasible region and determine which vertex maximizes Z=2x+3yZ = 2x + 3y.

Answer

Vertices: (0,0)(0, 0), (8,0)(8, 0), (6,4)(6, 4), (2,8)(2, 8), and (0,6)(0, 6) (note that (0,6)(0,6) is tighter than (0,10)(0,10) and (0,16)(0,16)). Maximum is 2828 at (2,8)(2, 8).\nKey steps: Axis bounds are min⁡(18,8,10)=8\min(18, 8, 10) = 8 on the xx-axis and min⁡(6,16,10)=6\min(6, 16, 10) = 6 on the yy-axis. Intersecting line pairs yields feasible corner points (6,4)(6, 4) (from 2x+y=162x+y=16 and x+y=10x+y=10) and (2,8)(2, 8) (from x+y=10x+y=10 and x+3y=18x+3y=18). Evaluating ZZ: Z(8,0)=16Z(8,0)=16, Z(6,4)=24Z(6,4)=24, Z(2,8)=28Z(2,8)=28, Z(0,6)=18Z(0,6)=18.

Loading workspace…