Resources
A commercial cold-storage facility operates under power constraints where the total daily electrical energy consumption (in kilowatt-hours, ) is modeled by , where represents the operational runtime in hours of chiller unit and represents the operational runtime in hours of chiller unit . Maintenance protocols mandate that chiller unit runs at least twice as long as chiller unit (), and neither unit may exceed of daily runtime (, ). Given that the facility consumed an energy snapshot of exactly while chiller unit operated at its upper bound of , reverse-engineer the initial operating state to determine the runtime of chiller unit , and verify whether this operating point strictly satisfies all system constraints.
Answer and steps
Final answer
Chiller 1 runtime: ; Constraint verification: The point satisfies and , so all operational constraints are strictly satisfied.
Steps
Identify the Given Variables and Formula
From the problem statement:
- Total daily energy consumption model:
- Recorded energy consumption:
- Runtime of chiller unit :
- Runtime of chiller unit : (unknown, in hours)
System constraints:
- Maintenance ratio:
- Daily runtime limits: and
Solve for the Runtime of Chiller Unit 1 ()
Substitute and into the energy equation:
Compute the energy used by chiller unit :
Substitute this back into the equation:
Subtract from both sides:
Divide by :
Thus, chiller unit operated for .
Verify All System Constraints for the Operating Point
Check each constraint using the operating point :
- Maintenance constraint ():
- Chiller unit 1 runtime limit ():
- Chiller unit 2 runtime limit ():
Common Pitfall: When checking inequality constraints like , remember that equality () satisfies a non-strict inequality (). Do not mistake it for a strict inequality ().
Since all conditions hold, the operating state strictly satisfies every facility constraint.
Typical errors
01 The student misinterprets the condition that chiller unit 2 runs at least twice as long as chiller unit 1 as x >= 2y instead of y >= 2x, incorrectly concluding that the constraint is violated.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 1
- Step 2
- Step 3Correct
The problem states that chiller unit () must run at least twice as long as chiller unit (), which corresponds to , not .
- Step 4Correct
Because this conclusion depends on the reversed inequality in step 3, it is marked as affected.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly substituted the known values into the energy equation and solved for .
You correctly verified that both chiller runtimes fall within the required to range.
THE ERROR
Where Your ACEpath Teacher Spotted the Mistakeno
WHY IT HAPPENED
ACEpath Teacher's DiagnosisYou swapped the dependent and independent roles of the variables when translating or transcribing the relational constraint, setting the multiplier on instead of .
REASONING PATH
Your ACEpath teacher’s suggested approach- Translating 'A is at least twice B'
'A runs at least twice as long as B' means . The factor multiplying belongs to the smaller reference quantity .
Match variable names to their exact physical definitions before evaluating: chiller is , chiller is , so .
CORRECTED PATH
ACEpath Teacher's DemonstrationVerify the correct maintenance constraint using : , which is true.
Combine all constraint checks: , , and all hold.
; all system constraints are strictly satisfied.
02 The student confuses strict inequality with non-strict inequality, concluding that y = 2x does not satisfy y >= 2x.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 1
- Step 2
- Step 3Correct
The symbol means "greater than or equal to." Equality () satisfies this condition, so the point does satisfy the constraint.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly substituted the known values into the linear energy model and solved for .
You verified that both runtimes satisfy the individual domain bounds and .
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeInterpreting as requiring strict inequality rather than allowing equality.
WHY IT HAPPENED
ACEpath Teacher's DiagnosisYou conflated non-strict inequality (, greater than or equal to) with strict inequality (, strictly greater than), causing you to reject a valid boundary point where .
REASONING PATH
Your ACEpath teacher’s suggested approach- Interpret Inequality Symbols
The symbol represents a logical OR: is true if OR .
When testing a boundary case where both sides evaluate to the same value (), confirm that the presence of the "or equal to" bar makes the statement true.
CORRECTED PATH
ACEpath Teacher's DemonstrationEvaluate the maintenance constraint at and : .
Since equals , the condition "greater than or equal to" is true.
Combine this with the domain checks: and are also satisfied.
Chiller 1 runtime is , and the operating state strictly satisfies all system constraints.
03 The student swaps the coefficients of x and y in the energy equation, leading to an incorrect runtime x = 18 h and a violation of the constraint y >= 2x.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 1Correct
You swapped the unit rates from the formula given in the problem statement (). Chiller consumes and chiller consumes , so the setup should be rather than .
- Step 2Correct
Your constraint verification logic was applied correctly to your calculated value of , but because should be , the condition becomes , which is (true). Therefore, the correct operating point actually satisfies all constraints.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly substituted the known value and cleanly solved your linear equation.
You tested all required constraints (, , and ) methodically.
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou inverted the coefficients of and , writing instead of .
WHY IT HAPPENED
ACEpath Teacher's DiagnosisMisaligning variables with their corresponding unit rates when transcribing a multi-variable linear model from text into an equation.
REASONING PATH
Your ACEpath teacher’s suggested approach- Variable-to-Coefficient Mapping
In a linear model , verify that each rate corresponds directly to its defined variable ( with unit 1 rate, with unit 2 rate).
Write down variable definitions with their associated rates side by side (, ) before setting up the equation.
- Boundary Value in Non-Strict Inequalities
A non-strict inequality is satisfied when .
When testing equality at the boundary (such as ), mark the condition as satisfied rather than violated.
CORRECTED PATH
ACEpath Teacher's DemonstrationSet up the energy equation using the correct coefficients: .
Substitute : .
Simplify the product: .
Subtract from both sides: .
Divide by : .
Check bounds: and are both satisfied.
Check the maintenance constraint: , which is true.
; all system constraints are strictly satisfied.
Lock it in
How do you translate 'quantity is at least times quantity ' into a mathematical inequality?
. The multiplier attaches to the base reference quantity .
Similar question
A delivery service uses vans () and trucks (). Total fuel consumed is . The protocol requires trucks to run at least times as many hours as vans (), with . If total fuel used is when , find and verify whether the operating point satisfies the protocol.
Answer
. Testing gives (True). Since , all constraints are strictly satisfied.
A hybrid generator uses biofuel () and natural gas () governed by . Operating rules state that natural gas runtime must be at least twice biofuel runtime (), and neither can exceed . If and , solve for and determine whether the constraints are satisfied.
Answer
. Check constraints: holds, but checking gives , which is False. The operating point violates the runtime ratio constraint.
Two pumps (runtime ) and (runtime ) fill a reservoir such that . Regulations mandate that Pump runs no more than half the time of Pump (), and both runtimes are capped at . If Pump runs for , find and check whether all constraints are satisfied.
Answer
. Checking gives , which is False. The constraint is not satisfied.