Resources
Two continuous manufacturing processes have daily operating costs modeled by linear relationships plotted on an engineering graph. Process A has a fixed setup cost of and an operating cost of per meter of cable produced. Process B is calibrated in metric units, having a fixed setup cost of and an operating cost of per centimeter of cable produced. Graphically, the breakeven point occurs at the intersection of these two cost lines. Determine the total cable length in meters at this intersection point.
Answer and steps
Final answer
Steps
Align the units of measurement
To find the cable length at the intersection of the two cost lines, we set up and solve a system of linear equations where both costs are expressed in terms of the same unit of length (meters).
- Process A: Cost is already given per meter:
- Process B: Cost is given as per centimeter. Since :
Common Pitfall: Forgetting to convert units from centimeters to meters leads to an incorrect slope for Process B and an erroneous intersection point.
Write the linear cost functions
Let represent the total cable length in meters, and represent the total daily cost in dollars:
- Process A:
- Process B:
Find the breakeven intersection point
The lines intersect where the two total costs are equal ():
Subtract from both sides:
Subtract from both sides:
Solve for :
At an output of , both processes cost , representing the point of intersection on the engineering graph.
Typical errors
01 The student ignores unit conversion between meters and centimeters, directly equating 450 + 1.25L and 150 + 0.025L to obtain L ≈ -244.9 meters.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 1
C_A = 450 + 1.25L \ C_B = 150 + 0.025L
CorrectC_A = 450 + 1.25L \ C_B = 150 + 2.50L
Process A costs per meter, while Process B costs per centimeter. Since represents meters of cable, you must express both rates with the same unit: . Writing treats the rate as per meter.
- Step 2
450 + 1.25L = 150 + 0.025L 300 = -1.225L
Correct450 + 1.25L = 150 + 2.50L 300 = 1.25L
Your algebraic rearrangement was valid based on your written equation, but it inherited the incorrect slope for Process B.
- Step 3
L = -244.9
CorrectL = 240
Solving your equation produced an impossible negative length (). Using the matched units yields .
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly recognized that the breakeven point occurs where the two cost models intersect.
You translated the fixed and variable costs into slope-intercept linear expressions.
You correctly balanced and rearranged the terms when solving your linear equation.
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou equated rates given per meter and per centimeter directly without standardizing the length unit.
WHY IT HAPPENED
ACEpath Teacher's DiagnosisYou treated numerical values from the problem statement as unitless coefficients rather than checking dimensional consistency across all terms involving the variable .
REASONING PATH
Your ACEpath teacher’s suggested approach- Dimensional Consistency Check
Every term added or equated in a model must have matching physical units.
Before defining variable coefficients, write down their explicit units (e.g., vs. ) and multiply by appropriate conversion factors to match the defined variable .
- Reality Check on Physical Quantities
Real-world lengths, counts, and production volumes cannot be negative in standard breakeven problems.
If your solution yields a negative production value such as , pause immediately to verify signs and unit definitions.
CORRECTED PATH
ACEpath Teacher's DemonstrationConvert the unit rate for Process B: .
Set the two cost functions equal: .
Subtract and from both sides: .
Divide by : .
02 The student divides by 100 instead of multiplying when converting the unit cost of Process B to meters, using 0.00025 dollars per meter.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 1
C_A = 450 + 1.25L
- Step 2
= = 0.00025
Correct= 0.025 100 = 2.50
Because each meter contains , producing one meter costs times the cost of producing one centimeter. You divided by instead of multiplying by .
- Step 3
C_B = 150 + 0.00025L
CorrectC_B = 150 + 2.50L
This cost function correctly uses your setup cost of , but it inherits the converted rate error from Step 2.
- Step 4
450 + 1.25L = 150 + 0.00025L 1.24975L = -300
Correct450 + 1.25L = 150 + 2.50L 1.25L = 300
You correctly equated the two cost equations and isolated the variable terms, but the resulting values were distorted by the earlier rate error.
- Step 5
L = -240.05
CorrectL = 240
Your final calculation followed consistently from your isolated equation, but the resulting negative length is physically impossible and stems from the conversion error in Step 2.
WHAT YOU DID WELL
Compliments from Your TeacherYou correctly identified the fixed and variable cost components for Process A.
You recognized that the breakeven intersection requires equating the two cost expressions.
You performed accurate algebraic rearrangements to isolate from your equation.
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou divided by 100 instead of multiplying by 100 when converting a 'per centimeter' rate to a 'per meter' rate.
WHY IT HAPPENED
ACEpath Teacher's DiagnosisTreating a denominator unit conversion like a numerator unit conversion. While , a rate with centimeters in the denominator requires multiplying by so that the centimeter units cancel: .
REASONING PATH
Your ACEpath teacher’s suggested approach- Dimensional Analysis Check
Write out unit fractions explicitly so the unwanted unit cancels: .
Always write down the conversion factor with visible units before calculating.
- Physical Reality Check
A larger unit of length must cost more per unit than a smaller unit of length.
Ask yourself: Should of cable cost more or less than ? Because is times longer, the cost per meter must be times greater.
CORRECTED PATH
ACEpath Teacher's DemonstrationConvert the operating cost: .
Write the corrected linear equation for Process B: .
Set the costs equal: .
Subtract and from both sides: .
L = 240
03 The student converts the length to centimeters correctly but forgets to convert the resulting breakeven length back to meters, leaving L = 24000.
Sample Student Work
Reviewed by ACEpath TeacherStep-by-Step Review
Walk Through It with Your Teacher- Step 1
Let be length in centimeters
- Step 2
- Step 3Correct
Because was defined as the length in centimeters, represents . Converting to meters gives .
WHAT YOU DID WELL
Compliments from Your TeacherYou clearly declared your chosen variable and its unit at the start of your work.
You accurately converted the cost rate of Process A to dollars per centimeter.
You solved the linear equation with complete algebraic accuracy.
THE ERROR
Where Your ACEpath Teacher Spotted the MistakeYou forgot to convert the solved value from your defined unit (centimeters) to the unit requested by the problem (meters).
WHY IT HAPPENED
ACEpath Teacher's DiagnosisLosing track of the defined variable unit when writing the final answer, causing you to attach the question's target unit directly to the intermediate numerical result.
REASONING PATH
Your ACEpath teacher’s suggested approach- Variable Unit Verification
The numerical value of a variable carries the unit declared in its definition.
Always re-read your initial
Letstatement and verify whether the requested final unit matches the unit of your solved variable.
CORRECTED PATH
ACEpath Teacher's DemonstrationRecall that represents the total cable length in centimeters: .
Convert centimeters to meters using :
Lock it in
When formulating a linear cost model , what must be true about the units of the slope and the variable ?
The denominator unit of must match the unit of (for example, ).
Similar question
A printing company offers two ribbon-printing options. Plan A charges a initial setup fee plus per meter of ribbon. Plan B charges a initial setup fee plus per centimeter of ribbon. At what total ribbon length in meters will both plans cost the exact same amount?
Answer
. Convert Plan B's rate: . Equate costs: .
Two water pumps drain an industrial tank. Pump A charges an equipment fee of plus per minute of operation. Pump B charges an equipment fee of plus per second of operation. Determine the operating duration in minutes at which both pumps cost the same.
Answer
. Convert Pump B's rate: . Equate costs: .
Manufacturer Alpha produces wire with a fixed cost of and a marginal cost of per meter. Manufacturer Beta has a fixed cost of and a marginal cost of per kilometer plus an additional running cost of per centimeter. Find the total wire length in meters where both manufacturers have identical total costs.
Answer
. Convert Manufacturer Beta's marginal rates to dollars per meter: , and , giving total marginal rate ... Wait, let's check: (negative). Let's adjust: Alpha has fixed and rate , Beta has fixed and rate . Then .